Close  

Contact Us

We will respond to your email request in 24 - 48 business hours.

All fields are required unless indicated optional.

  • The information you provide on this Contact Us form will be used to respond to your request and as further described in our Internet Privacy Policy.

    Please be aware that this information (including the original and the subsequent reply) may be transferred to a server located in the U.S. for metrics and storage. If you do not consent to this use of your personal information, please do not use the Contact Us system.

  • SEND
Thank you for contacting 3M.

Most inquiries are responded to within two business days. However, some questions require further investigation or clarification.

CHAT WITH TECHNICAL SUPPORT

3M™ Aluminum Conductor Composite Reinforced Customer Installations - Changing Clearance Requirements

  • Grays Harbor Public Utility District, Aberdeen, Washington USA – Chehalis River Estuary Crossing, 115 and 69 kV

    Grays Harbor PUD used 3M ACCR to avoid tower construction in an environmentally sensitive area on the banks of the Chehalis River. The utility needed to increase clearances to enable them to raise the fiber optic line over the river to meet Army Corps of Engineers’ requirements. By using the conductor, they were able to meet those requirements, increase capacity and upgrade 3 circuits on the same crossing without enlarging towers. This allowed them to avoid permitting and other potential delays by using existing rights-of-way and towers.

  • Allegheny Power, West Virginia, USA - Bedington-Nipetown, 138 kV

    Allegheny Power, a division of Allegheny Energy Inc., installed 3M ACCR to upgrade a 138 kV line linking the Bedington and Nipetown substations along Interstate-81 in West Virginia. The 1.7-mile upgrade boosted transmission capacity on a line some 50 miles northwest of Washington, D.C. The 138 kV line shares structures with three other lines for most of its length, including two under-built 12 kV lines, has a flow of 2,200 amps and is expected to peak at a temperature of 200°C. The line is built on self supporting steel poles with drilled pier concrete foundations.